Steven's Croft biomass power station

Steven’s Croft in Lockerbie, Scotland is the UK’s largest wood fired biomass station. With an output of 44MW, the station supplies the electrical needs of 70,000 Scottish homes, displacing around 140,000 tonnes of greenhouse gases.

... named Best Renewable Project in the Scottish Green Energy Awards for its success and benefits in supporting forestry, sawmilling operations and the local community.

44MW
biomass station output
70,000
supplies the electricity needs of 70,000 Scottish homes
140,000
tonnes of greenhouse gases displaced

This project involves the use of various renewable wood based fuels including forest wood and agricultural residues, urban wastes and energy crops, all of which are readily available in the local area. We project managed the £90M development, from design and construction supervision to commission and take over. Construction included the power station in Steven’s Croft, a fuel processing facility and 26km underground electrical cable connecting the station to Chapel Cross substation. Scottish Power completed the installation which incorporates a long directional drill beneath the M74 motorway.

Carbon neutral fuel

The plant is fuelled entirely by biomass material. Over 480,000 tonnes of fuel is needed to power the station every year. Arriving from the local area the fuel comprises:

  • 60% sawmill co-products and small roundwood

  • 20% short rotation coppice (willow)

  • 20% recycled fibre from wood product manufacture

Burning biomass is a clean way of generating electricity and is often called ‘carbon neutral’. The carbon released into the atmosphere when the material is burnt is equivalent to the amount absorbed by the plant during its growth cycle.

Power and fuel supply

The fuel processing facility was designed to store and blend all various fuel sources to provide an homogeneous fuel. It includes up to 14 days of round wood storage, a facility for reception of pre-chipped fuel, up to 6000m3 of covered chipped fuel storage, a round wood chipping facility, fuel reclamation and forwarding equipment with systems for final preparation of the fuel before delivery to the power plant.

The boiler conditions were designed to allow the best efficiency at 537°C, 137 Bar and with a capacity to raise 126MWth of energy. The high steam conditions dictated the need for specialist corrosion resistant materials in the high temperature components and to control fuel quality.

The station is regulated by the Scottish Environmental Protection Agency. The main applicable legislation is the Waste Incineration Directive and the Large Combustion Plant Directive, which defines acceptable emission levels. These regulations demand state of the art equipment, which comply with Best Available Technique guidance. The power station’s emissions are therefore reduced to the minimum level achievable.

The site's surface water drainage system has been designed around the sustainable urban drainage system (SUDS) guidance, to retain water on site and disperse through natural infiltration in the first instance. Rainfall is captured in swales and is retained until the water disperses. On overflow, the surface water is sent to a secondary cleaning facility which comprises a wetlands area. Water travels through this wetlands system and is cleaned before naturally flowing into a watercourse. Aqueous emissions are restricted to blowdown water from the boiler and water treatment effluent. Discharge is to the local watercourse at extremely low flow rates to ensure there is no adverse impact to local water quality.

We use necessary cookies to make our site work. We'd also like to set optional analytics cookies to help us improve it. We won't set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

Reject cookies Manage cookies
expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play