Road reconstruction, Czech Republic

Following our role in conducting a pre-investment study for the European Investment Bank (EIB) in 1994, the Czech government was able to agree joint funding from the EIB and EU Phare fund for an extensive programme of road rehabilitation on the Czech E roads network.

We were appointed by the Road and Motorway Directorate of the Czech Republic following international tendering to provide a wide range of consultancy services during implementation of this €420M programme.

The whole project consisted of 16 contracts for the rehabilitation of existing highways and bridges and the construction of new roads and structures. Eleven of these contracts involved reconstruction work on 317km of highway and the rebuilding or replacement of 83 bridges. The other five contracts focused on 13km of new construction, with 21 new bridges and viaducts.

Our role included:

  • Monitoring all essential aspects of programme preparation and implementation and reporting these to the EIB and EU.
  • Assisting the Roads Directorate’s project management unit in preparing individual projects – especially in assessing complex design documents to ensure a high standard of technical and economical parameters.
  • Helping the project management unit prepare tender documents, evaluate tender offers and select contractors, in accordance with EU and EIB procedures.
  • Supervising individual projects and cooperating with the Roads Directorate’s implementation unit in monitoring works progress and time schedules.
  • Upgrading the existing road database and pavement management system.
  • Introducing new techniques for road and structural rehabilitation.
  • Preparing a highway economic assessment based on the HDM-4 model.

We use necessary cookies to make our site work. We'd also like to set optional analytics cookies to help us improve it. We won't set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

Reject cookies Manage cookies
expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play