Road reconstruction, Czech Republic

Mott MacDonald provided a wide range of consulting services for the rehabilitation and construction of roads, highways, and bridges in the Czech Republic.

Opportunity

After Mott MacDonald conducted a preinvestment study for the European Investment Bank (EIB), the Czech government agreed on joint funding from the EIB and the European Union's Phare Fund to upgrade its roads, highways, and bridges.

The project consisted of 16 contracts for the rehabilitation of existing highways and bridges and the construction of new roads and structures. Eleven of these contracts involved reconstruction work on 197 miles (317 kilometers) of highway and the rebuilding or replacement of 83 bridges. The other five contracts focused on 8 miles (13 kilometers) of new construction, with 21 new bridges and viaducts.

Solution

Following international tendering, we were appointed by the Road and Motorway Directorate of the Czech Republic to provide a wide range of consulting services during implementation of this €420 million program:

  • Monitoring essential aspects of program preparation and implementation and reporting these to the EIB and EU
  • Assisting the Roads Directorate’s project management unit in preparing individual projects
  • Helping the project management unit prepare tender documents, evaluate tender offers, and select contractors in accordance with EU and EIB procedures
  • Supervising individual projects and cooperating with the Roads Directorate’s implementation unit in monitoring works progress and time schedules
  • Upgrading the existing road database and pavement management system
  • Introducing new techniques for road and structural rehabilitation
  • Preparing a highway economic assessment based on the HDM-4 model

Outcome

By assessing complex design documents, Mott MacDonald helped ensure a high standard of technical and economical parameters. Our contribution streamlined the bidding and construction process, and helped projects stay on time and on budget.

We use necessary cookies to make our site work. We'd also like to set optional analytics cookies to help us improve it. We won't set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences.

Reject cookies Manage cookies
expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play