400kV transmission line, Botswana

We acted as owner’s engineer to Botswana Power Corporation (BPC) for the 218km, 400kV transmission line from Morupule ‘B’ power station to Isang substation.

Key services

  • Engineering – complete engineering services, feasibility, preliminary and detail final design reports, principal design and technical specification.
  • Procurement – preparation of procurement package including conceptual design, technical specification, commercial terms and conditions, tender evaluation and adjudication report.
  • Detailed design – approval of contractors' detail designs, supervision of construction, erection and commissioning
  • Project and construction management.

Key facts

  • The project comprised the design outline and implementation of a 400kV single circuit guyed tower transmission line
  • The African Development Bank (ADB) provided financing for the project
  • The project capital cost was £14.2 million
  • The project duration was 36 months

Challenges

  • The project required the design of towers to be fit for purpose, yet cost-effective
  • Crossing of obstacles such as rivers, major roads and railway lines
  • Poor and varying ground conditions through the Kalahari Desert made it difficult to achieve the required tower footing earth resistances.

Solutions

  • Economical approach to the design of towers by type testing the design parameters at an accredited testing centre in India
  • Large spans were used to cross large obstacles such as the Mahalapye River. The line route section was designed to be as direct as possible between terminals, while minimising the environmental and sociological impact on affected communities.
  • Special earthing using deep copper electrodes buried in conducting cement allowed the required tower footing earth resistances across the Kalahari Desert.

Value and benefits

  • Our experience provided an economically advantageous line design with a suite of towers to meet the project objectives.
expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play
×