This edition of Momentum features projects on which innovation has been key to achieving success.
Cost, time and safety gains
- 10% cost saving on Singapore’s largest road tunnel
- 20% time saving on Edinburgh hospital
Ground-breaking use of technology
- Using satnav data to strengthen transport plans
- Cutting peak power demand by 40% in the UAE
- Raising standards and strengthening India’s education system
Dramatically improving performance
- 80% reduction in dengue fever infections
- 70% energy saving on 1970s university building
- More effective and durable corrosion protection at 50% less cost