Locale : North America (English)
X
Create document Page
added
Remove
page
Add
page
Review document
/
Page Added
Collected
Pages
Create

Assessing the environment of New York and New Jersey ports

An in-depth assessment of environmental conditions at six port sites received a commendation from the Port Commerce Department of the Port Authority of New York and New Jersey.

Opportunity

In support of the US Army Corps of Engineers’ Harbor Navigation Environmental Impact Statement (EIS), the Port Authority of New York and New Jersey needed to characterize existing environmental conditions at the upland portion of six port sites in New York and New Jersey:

  • Port Newark/Elizabeth Marine Terminal
  • Port Jersey/MOTBY
  • Howland Hook Marine Terminal
  • Stapleton
  • South Brooklyn Marine Terminal,
  • Brooklyn: Red Hook Terminal

Solution

The Authority retained Mott MacDonald to conduct the assessment. In Phase 1, we identified, assembled, and performed a preliminary review of relevant environmental studies and reports associated with the identified project sites. The documents were those deemed to be of use in describing environmental conditions required as part of the overall assessment of the harbor area.

A summary document was prepared which included a listing of the collected documents and a preliminary assessment of their relevance and usefulness with regard to the ongoing Harbor Navigation Study.

In Phase II, we continued data collection and assessment and prepared a Baseline Environmental Conditions Report documenting existing upland conditions of the individual port sites and the New York Bay region. The report also included an annotated bibliography and identified “data gaps” with regard to the adequacy of existing information to describe existing conditions.

We synthesized the body of information generated as part of this project and also provided the information in tabular form along with estimated time frames and costs to fulfill identified data gaps.

Based on the work performed in the preparatory phases of the harbor assessment, the Port Authority retained us to continue to provide environmental assessment services at five of the six upland port sites Due to technical issues, one of the original port sites was dropped from further consideration. Additional data collection and interpretive tasks were performed and summarized in a report supporting the September 1999 NY and NJ Harbor Navigation Study NEPA EIS.

Outcome

Mott MacDonald identified impacts including cumulative impacts based upon increased productivity and economic activity at each port site and the overall region. We received a commendation from the Port Authority’s Port Commerce Department for the quality of work product, availability of personnel, and completing the project within the necessary time frame.

We continue to work on this project through the performance of air quality evaluation and analysis. Baseline emissions are being studied to evaluate methods to decrease emissions in the harbor.

expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play
×
Mott MacDonald main logo

Would you like to hear more from us?

Sign up to receive notifications