Clicky

Locale : North America (English)
X
Create document Page
added
Remove
page
Add
page
Review document
/
Page Added
Collected
Pages
Create

Quantity Surveyor

Job Profile

Mott MacDonald track record in rail dates back to the early 1900s with the construction of the City and South London Railway. We now provide rail engineering consultancy and advisory services through teams based in over 35 offices globally.

We have experts in railway systems, rolling stock, rail operations, asset management and infrastructure upgrade and renewal; many of whom have previously worked for infrastructure controllers, operators, manufacturers or contractors. We understand the vital need for robust systems integration and assurance and are able to address these.

Examples of our services includes: alignment, track form, train control, signaling, telecommunications, rolling stock, operations, safety assurance systems, mechanical and electrical systems, traction power, overhead line, human factors and ergonomics, RAMS, fire engineering, tunnels, bridges, earthworks, stations, intermodal depots, materials handling and freight yards.


Project - Government of India is implementing a Dedicated Freight Corridor project (DFCC). The Work on the Eastern section of the Dedicated Freight Corridor (DFCC) between Mughal Sarai and Bhaupur (approx. 402 Kms) is to be constructed as an electrified (2 x 25kV AC - 50 Hz) double track railway, capable of operating at a maximum train speed of 100km/h.

Mott MacDonald's role is for project management consultancy for the above mentioned project.

Job Description

As Quantity Surveyor following duties as follows:

  • Preparation of daily/weekly/monthly progress reports.

  • RFIs-making proper coordination with the field staff.

  • Monitoring contractor’s Payment Process.

  • Daily monitoring the quantity measurements of the executed works.

  • Conduct Independent measurements of the works and check calculations of quantities.

  • Preparation of Contractor Bills/IPA/IPC (Interim Payment Applications/Certificates).

  • Projecting requirement of materials for the project.

  • Preparation of Cross Section and construction drawings.

  • Preparation/calculation of extension of time (EOT).

  • Documentation like preparation of progress reports to the clients and Independent consultant overall contract administrator including calculation of rate analysis and Billings.

  • Preparation of Bills of Quantities, Cost Estimate, Rate Analysis to assist in the tender process.

  • Assessment of Contractor’s progress/delay financial/contractual claims.

  • Assessment of Variations of the various quantities.

  • Assessment of the final Project Cost.

  • Preparation and valuation of progress and final payments in connection with any contract or sub-contract.


Candidate Specification

B Tech/Diploma in Civil Engineering.
More than 3 yrs for B Tech OR 5 yrs for Diploma
icon-arrow-down-smlicon-arrow-left-lrgicon-arrow-left-smlicon-arrow-right-lrgicon-arrow-right-smlicon-arrow-up-smlicon-championsicon-closeicon-downloadicon-educationicon-emailicon-grid-viewicon-languageicon-link-toicon-list-viewicon-locationicon-login-registericon-minusicon-moreicon-phoneicon-plusicon-recently-viewedicon-searchicon hashkey-facts-corner-sashquote-underlinesocial-icon-facebooksocial-icon-googleplussocial-icon-linkedinsocial-icon-twittersocial-share-icon-facebooksocial-share-icon-facebooksocial-share-icon-googleplussocial-share-icon-googleplussocial-share-icon-instagramsocial-share-icon-instagramsocial-share-icon-linkedinsocial-share-icon-linkedinsocial-share-icon-twittersocial-share-icon-twittersocial-share-icon-youtubesocial-share-icon-youtubesina-weiboMM-Shape01-Quote-ViewsMM-Shape03-Quote-LocationsMM-Shape05-Quote-ProjectsMM-Shape12-Quote-SectorsMM-Shape13-Quote-ExpertiseMM-Shape14-Quote-About-UsMM-Shape14-Quote-Careerscheckmarkicon-expand-viewicon-apply-nowmenusphereicon-cookiesicon-legalicon-registered-companiestargetrotate-screenvideo-replay-flatvideo-replayaudio-muteaudio-play