We, our clients and our project partners, have been reaping the benefits of our vision: better resolved solutions, reduced waste both in time and in materials, faster project delivery, reduced risk, enhanced sustainability and better whole-life performance. Right the way through the asset life-cycle, BIM saves time and money. It enables more effective integrated through-life information management as well as stronger business continuity.
Ten benefits we're bringing with BIM
Better outcomes through collaboration
Enhanced performance
BIM makes possible swift and accurate comparison of different design options, enabling development of more efficient, cost-effective and sustainable solutions.
Optimised solutions
Through deployment of new generative modelling technologies, solutions can be cost-effectively optimised against agreed parameters.
Greater predictability
Projects can be visualised at an early stage, giving owners and operators a clear idea of design intent and allowing them to modify the design to achieve the outcomes they want. In advance of construction, BIM also enables the project team to ‘build’ the project in a virtual environment, rehearsing complex procedures, optimising temporary works designs and planning procurement of materials, equipment and manpower.
Faster project delivery
Time savings of up to 50% can be achieved by agreeing the design concept early in project development to eliminate late stage design changes; using standard design elements when practicable; resolving complex construction details before the project goes on site; avoiding clashes; taking advantage of intelligence and automation within the model to check design integrity and estimate quantities; producing fabrication and construction drawings directly from the model; and using model data to control construction equipment.
Reduced safety risk
Crowd behaviour and fire modelling capability enable designs to be optimised for public safety. Asset managers can use the 3D model to enhance operational safety. Contractors can minimise construction risks by reviewing complex details or procedures before going on site.
Fits first time
Integrating multidisciplinary design inputs using a single 3D model allows interface issues to be identified and resolved in advance of construction, eliminating the cost and time impacts of redesign. The model also enables new and existing assets to be integrated seamlessly.
Reduced waste
Exact quantity take-offs mean that materials are not over-ordered. Precise programme scheduling enables just-in-time delivery of materials and equipment, reducing potential for damage. Use of the BIM model for automated fabrication of equipment and components enables more efficient materials handling and waste recovery.
Whole life asset management
BIM models contain product information that assists with commissioning, operation and maintenance – for example sequences for start-up and shut-down, interactive 3D diagrams showing how to take apart and reassemble equipment, and specifications allowing replacement parts to be ordered.
Continual improvement
Members of the project team can feed back information about the performance of processes and items of equipment, driving improvements on subsequent projects.