Opportunity
The City of Toronto suffered from fluctuating electrical failures due to varying weather trends as a result of climate change. A plan was required to address potential failures at critical facilities.
Solution
So that we could fully understand the extent of the issues that were created by climate change, a risk assessment of the utility, climate change, maintenance and operational risks associated with electrical power systems had to be completed.
Outcome
Through completing the risk assessments, we were able to provide for the client, three tailored investment options that would improve the resilience of backup power systems that the city had.