Tunnelled solutions provide a discreet option for transport and utility pathways that can reduce disruption, minimise visual impact and increase service life and whole-life value.
But each tunnel – from the smallest and simplest to the largest and most complex – has its individual challenges.
Whatever your tunnel project, it can benefit from our design expertise and practical understanding. We will ensure safety, efficiency and sustainability from the initial design through to project completion.
Our tunnelling heritage goes back more than 130 years. We use that experience to select exactly the right design and construction technologies for your project. We use advances in materials, automation and waste management to optimise and innovate solutions.
Use any method, in all conditions
Bored, drill and blast, cut and cover, immersed tubes, trenchless (micro-tunnelling, pipejacking and directional drilling), sprayed concrete lining, sequential excavation. You name the tunnelling method, we’ve used it. From hard rock and soft soil to seismically active regions, deep tunnels under high groundwater pressure or sub-sea tunnels under busy sea lanes, we’ve navigated our way through all types of ground conditions. This experience and learning is crucial to success of your tunnel project.
Apply innovative techniques
We’ve developed innovations and embraced new technologies to deliver subterranean structures, including the first use of precast concrete and bolted tunnel linings, which improved the speed, safety and cost of installation. We invented the bentonite slurry tunnel boring machine to enable soft ground tunnelling and developed the observational method to improve the speed and safety of shaft and tunnel excavation. We’ve also made advances in sequential excavation and sprayed concrete linings, which are now the go-to solution for hydropower caverns, stations, crossover caverns and connecting passages.
Help cut carbon
We apply carbon management on all our projects, to help you pursue your decarbonisation goals. We’ve reduced the carbon footprint of tunnels worldwide and continue to innovate with materials and methods to deliver sustainable solutions.
Central Kowloon Route, Hong Kong. A 4km highway tunnel will link areas across Hong Kong’s populous Kowloon peninsula, helping to relieve congestion as well as reduce air and noise pollution.
Our tunnelling teams work with owners, operators, contractors and investors to plan, design and deliver transport, power and water tunnel projects around the world. We can take care of every stage of your tunnel project, from initial planning and feasibility studies through concept and detailed design, costing and specification, procurement, project management, construction management and supervision, to repair and maintenance.
Our teams are based globally, and available to support in-person. We operate a global practice network that provides subject-matter expertise as needed.
We can:
We can:
We can:
We are working with owners and contractors to plan, design and deliver subterranean structures across the globe:
UK
Mike Savill
Tunnel practice leader for UK and Europe
Over the past two decades, cities have embraced new solutions in surface flood management that deliver environmental and social value alongside flood mitigation.
With ever-changing and increasingly complex contractual model interfaces, proper understanding and allocation of the responsibility for construction impact assessments, risks, and instrumentation and monitoring is essential.
In her nearly 30-year career, Mott MacDonald’s tunnels lead, Rosa Diez, has worked on some of the world’s most significant rail tunnelling projects. But it was her passion for geology, rather than trains, that set in motion a career in this challenging area of infrastructure engineering.
Project delivery has transformed significantly due to rapid advances in technology. Digital delivery is more than just a deliverable, it’s a strategic enabler that drives efficiency, innovation, and better outcomes.
Senior project engineer Amanda Wachenfeld discusses her approach to improving processes that allow for increased efficiency across her teams and projects.
To honor the three-year anniversary of its full service to Grand Central Station, we caught up with four of our tunnelling experts in New York as they reflect on their years of work on East Side Access.
We caught up with senior project engineer and tunnel ventilation lead Scott Shi to talk about the importance of Fire and Life safety and his experience working for Mott MacDonald around the world.
Our role focuses on the major design-build package covering excavation, tunneling, and structural shells for the future 106th Street Station and its connecting tunnels.
The Metro Tunnel, Victoria’s largest public transport investment in decades, opened on 30 November. It is expected to create capacity for 500,000 additional passengers each week and provide better access to hospitals, universities and employment hubs.
An enormous boring machine being used to dig HS2’s Birmingham approach tunnels has broken through, marking the completion of major tunnel excavation between London’s Old Oak Common and the West Midlands.
Mott MacDonald has appointed Andy Clarke as development manager, UK and Europe for its Heavy Civil Infrastructure (HCI) division.
At this year’s World Tunnel Congress (WTC) in Stockholm, Sweden, Mott MacDonald’s Randall (Randy) Essex was honored as an inaugural Fellow of the International Tunnelling and Underground Space Association (ITA).
HS2’s giant tunnelling machine Mary Ann broke through on 9 May 2025, marking the end of her mission to excavate the first bore of what will soon become the longest railway tunnel in the West Midlands.