Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Building successful defence capability involves considering and planning all lines of development (training, equipment, personnel, infrastructure, doctrine, organisation, information, and logistics) in an integrated way
Bringing the various end users and stakeholders together in ‘design charrettes’ is a good way of understanding all requirements and laying the groundwork for a smooth design process
For large and complex programmes, using a health check methodology to establish that you have the right processes and capabilities in place can prevent issues further down the line
Early-stage collaboration and strategic thinking is required to develop the right equipment, infrastructure and personnel to respond to today’s challenges, and to prepare for changing technologies and scenarios in the future, writes Rob McHardy.
The delivery of any military capability is full of complexity. Technology is developing at pace, making it difficult to predict how requirements will evolve. Changes in the geopolitical landscape, as shown by the current situation in Europe, can result in rapid re-prioritisation of projects and programmes. Equipment, infrastructure, organisation and more, must all come together at the right time to be continuously operationally ready.
We have a proven approach that can help those involved with delivering military capability, both for the UK and our NATO allies, to de-risk large programmes within the sector. The principal points that we would highlight are:
An integrated approach is needed to plan and deliver the various strands that make up military capability. Seemingly obvious, the reality is that this remains a challenge. Defence projects are more likely to succeed when the eight Ministry of Defence Lines of Development (Training, Equipment, Personnel, Infrastructure, Doctrine, Organisation, Information, and Logistics) are planned and considered together. Because of the lead times involved, it’s crucial that equipment and infrastructure are developed in tandem, that their planning starts at the same time and remains connected and coherent throughout.
Strategic planning must consider the benefits, costs and risks involved in each strand of capability over the whole lifecycle – concept, assessment, demonstration, manufacturing, in-service and disposal – which may be a span of decades. The pace at which the world is changing (geopolitically, sociologically and technologically) makes it essential to consider a range of future scenarios and to build flexibility and adaptability into your programmes to make them as robust as possible. Producing roadmaps for equipment, infrastructure and personnel programmes that will identify key risks, support mitigation planning and enable the best-informed decisions are fundamental to this.
We are supporting NATO, as a member of Boeing’s consortium ABILITI, to redefine how it will conduct aerial surveillance following the retirement of the Airborne Warning and Control System fleet in 2035. With several technologies under consideration for the replacement, we’re using roadmapping, lifecycle cost analysis and risk analysis to help the alliance understand all the implications of this decision in terms of infrastructure needs, through-life management of assets, and more. Our analysis will help NATO schedule effectively to minimise programme risk and plan how lifecycle costs will be met between the alliance and its member nations.
Large defence programmes typically serve multiple groups of end users, involve different agencies and branches of the military, and are delivered by many commercial partners. So a fundamental challenge is one of collaboration: we need to ensure that high quality information flows between these different stakeholders as early as possible, that requirements are clearly captured and that there is a collective approach to problem-solving. Allocating an end-user champion, or sponsor, to each major requirement of the project is a good way of fostering informal collaboration through the design process to complement the reviews held at formal project gateways.
We found the use of ‘design charrettes’ to be invaluable for the whole project team for the RAF Lakenheath F-35 Beddown Programme, which was recognised in 2022 with the Institute of Collaborative Working (ICW) award for Collaboration in Defence. We used ‘design charrettes’ on the project to involve all members of the value chain as we helped deliver infrastructure ahead of the arrival of the new F-35 aircraft. These participatory workshops, held on site and each lasting several days, highlighted exactly what users wanted out of a particular asset and how the aircraft would be fully integrated. This allowed discussion of constraints and challenges, helped the different stakeholders align their needs and objectives, and generated real momentum for the design process.
Large defence programmes typically serve multiple groups of end users, involve different agencies and branches of the military, and are delivered by many commercial partners. So a fundamental challenge is one of collaboration.Rob McHardyProject director for defence
A significant consideration for large, complex programmes is the required capability across the organisations involved in delivery. Are the approaches to governance, risk, asset management, procurement and systems integration fit for purpose? Using a methodology such as the UK Infrastructure and Project Authority’s Project Routemap to assess the required level of capability supports better planning and decision making from the early stages of development. Our role as delivery partner for the 10 Dock Project and the wider Major Infrastructure Programme at HM Naval Base Devonport saw us produce a health assessment and transition plan that helped enhance key business functions, including commercial, project controls, project management, construction, commissioning, and design management.
An approach that has helped accelerate the schedule and reduce risk across many of our key major programmes is the use of specialised, cross-functional ‘Tiger Teams’ to investigate and solve challenges and critical issues as they develop. With a mix of domain and project management expertise, this small but agile team can act as part of the internal assurance function, quickly identifying the cause of an emerging issue (for example, a lack of clarity with respect to roles and responsibilities) and making recommendations to project leaders. A good Tiger Team will be able to identify the ‘tradable spaces’ in which choices or compromises are necessary, and pinpoint the sometimes difficult decisions that must be made to unblock progress.
In summary, spending a little more time and money at the outset of a project or programme – on strategic investment appraisals, optioneering, establishing user needs and requirements, and understanding your capabilities and gaps – can unlock better delivery. Gaining the best information before making an investment decision, and developing the trust within the delivery team that enables truly collaborative working, will give you the best chance of making the right choices and put you on the best footing to meet your objectives in an integrated way.
Talk to us about how we can help you deliver integrated capability in the defence sector: defence@mottmac.com
Rob McHardy, project director for defence
According to Mott MacDonald technical director for nuclear: civil and defence, John Palmer, projects need to build in greater agility rather than rely on fully focusing on requirements.
Defence and security leader Adrian Garnero introduces an 8C framework to continue to build trust, mobilise industry, and deliver a legacy of trilateral capability across the AUKUS enterprise.
Rapid and effective procurement will be essential to the enhancement of the UK’s military capabilities as set out under the Strategic Defence Review. Private sector involvement is key to achieving that.
Delivering complex defence projects on time and to budget in the face of increasingly serious and diverse threats requires a change in both approach and mindset, according to Mott MacDonald principal account lead for defence John Hansford.
Delivering design “right first time” is critical to meeting the scale and pace of defence infrastructure investment set out in the UK’s Strategic Defence Review.
More than a decade on from joining Mott MacDonald to head up risk management, Hazel Arthur looks at how her team has evolved to match client’s needs.
Mott MacDonald has played a key role in the successful delivery of a new £10M Regimental Headquarters for 154 (Scottish) Regiment Royal Logistic Corps (RLC) in Dunfermline.
Work has started on the major redevelopment of the Royal Naval Air Station (RNAS) Culdrose in Cornwall. Mott MacDonald is delivering technical assurance, NEC project management services and site supervision through the construction stage.
Mott MacDonald has project managed the successful delivery of a new £27M base for the Ministry of Defence (MOD), which will support NATO’s strategic operations and its mission-critical communications infrastructure.
The Australian Department of Defence has appointed Mott MacDonald as a project delivery services (PDS) contractor under the Base Services Transformation Program (BSTP).
Lessons learned from renewal of the runway at RAF Lossiemouth in Scotland in 2021 have benefitted the recently completed runway refurbishment works at RAF Leeming.
As Calgary prepares for a future where its population could double by 2076, the city is investing in infrastructure that meets both today’s needs and tomorrow’s possibilities.
Preparation of RAF Lakenheath in Suffolk for the arrival of the new 5th generation F-35 fighter aircraft has not only been trail-blazing and award-winning for its collaborative approach. The work delivered by Mott MacDonald as delivery partner has also set new standards that are benefiting other defence projects.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.