Technology drives creativity and quicker, more cost-effective projects. A step change for our industry.
See how we connect innovation to outcomes.
Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Mott MacDonald, in partnership with GHD and Stantec under the Water2Wire joint venture (JV), has been selected by Queensland Hydro as the dams designer delivery partner for the Borumba Pumped Hydro Project.
Water2Wire JV was formed to accelerate the development of pumped hydro across Queensland and brings together significant Australian and international design capability, and has already delivered the 5GW Pioneer Burdekin FEED Design.
As dams designer delivery partner, Water2Wire JV will be responsible for leading the engineering and design for the project’s seven proposed dams: six new dams to form a new upper reservoir, and one new dam wall and spillway immediately downstream from the existing Borumba Dam. The dam wall will see Lake Borumba increase its capacity providing security to the proposed energy storage scheme.
Queensland Hydro CEO Kieran Cusack said: “Water2Wire has consistently demonstrated their expertise in delivering world-class hydropower and dam projects. The three companies of the joint venture will bring their significant dams and hydro design experience to our Borumba Project, and we are excited to be partnering with them.”
Adrian Jones, regional managing director for Asia Pacific, New Zealand and Australia, Mott MacDonald, said: “Pumped hydro plays a pivotal role in the energy transition and helps foster a more sustainable, reliable and resilient energy system. This landmark project will play a major role in supporting Queensland's commitment to transitioning to 80% renewable energy by 2035, with capability to dispatch 2,000MW and store up to 24 hours of energy. Alongside Stantec and GHD, we look forward to bringing our extensive experience supporting the delivery of pumped hydro projects in Australia and around the world, to this project.”
Mott MacDonald has worked on a number of key pumped hydro storage projects in Australia including Kidston, Pioneer-Burdekin and Muswellbrook.
Australia’s water infrastructure, much of it built in the 1960s and 70s, is at a critical juncture. Built for a different climate and demographic reality, many systems are now operating beyond their intended design life.
The responsible use of AI is paramount to bridging ASEAN’s digital divide and infrastructure deficit, unlocking sustainable growth and a brighter future for the region.
Democratisation of electricity and social value were at the heart of our energy transformation work 125 years ago, and remain vital today says Paul Currie, Mott MacDonald’s leader for energy in Asia Pacific, Australia and New Zealand.
The free guide offers a practical framework for embedding nature-based design in the Australian built environment.
Mott MacDonald has reported another year of growth in its revenue for 2024, with the global engineering, development and management consultancy reaching £2.5bn across its global regions for the first time.
The South Australian Government has appointed Mott MacDonald to deliver a detailed business case to transition to zero emission operations across their passenger rail network.
In a bold move to decarbonise its energy system, the Shire of Collie – long known as Western Australia’s “coal town” – is boosting its grid resilience and sparking regional growth with the Enpowered Collie solar and battery energy storage system (BESS).
This is the story of how we partnered with South East Water to develop the decarbonisation roadmap, processes and internal capability that has put it ahead of future reporting obligations.
The 750MW Capricornia Pumped Hydro project is under development in Queensland, Australia. Expected to be operational by 2032, the project will deliver enough power to meet roughly 4% of Queensland's total energy demand.
Discover how Queensland Independent Schools Block Grant Authority (QIS BGA) and Mott MacDonald are helping Queensland schools integrate sustainability into their operations and curriculums.
Digital engineering is transforming Victoria’s Big Build, making transport projects smarter, faster and more connected than ever. From planning to delivery and maintenance, data is now streamlined and accessible – changing the way infrastructure is managed.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.