Technology drives creativity and quicker, more cost-effective projects. A step change for our industry.
See how we connect innovation to outcomes.
Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Mott MacDonald and Arcadis have been appointed by the Welsh Government as technical advisor and employer’s agent for the A483 Llandeilo to Ffairfach relief road. Together, they will deliver the next phase of this strategically important infrastructure scheme in West Wales.
The team will be responsible for taking the project through design development, statutory order publication and construction supervision.
The A483 Llandeilo to Ffairfach relief road scheme aims to address the localised impact of traffic in Llandeilo and Ffairfach, which sit on the Strategic Road Network and experience high volumes of HGV traffic. The new route will divert through-traffic away from the town centres, creating safer, more pedestrian-friendly environments while unlocking opportunities for regeneration.
The appointment builds on Mott MacDonald’s recent delivery of major A40 Llanddewi Velfrey to Redstone Cross improvements in Pembrokeshire, reinforcing its strength in delivering strategic highway schemes across Wales.
We’re excited to help deliver a scheme that will make a real difference to communities in Llandeilo and Ffairfach — improving safety, supporting regeneration and enabling more sustainable travel. Partnering with Arcadis, we look forward to bringing our shared expertise to this important project.Richard Griffiths
Working on behalf of Welsh Government, Mott MacDonald and Arcadis will now commence the procurement of the Early Contractor Involvement (ECI) contractor and oversee advanced works including surveys and design activities to de-risk the programme and ensure a smooth transition into delivery.
Solving the transport issues of today and tomorrow calls for a wider range of tools, solutions and skills, according to Mott MacDonald transport and mobility solutions general manager Graeme Smith.
Ninety years since opening, the Queensway Tunnel connecting Liverpool and Birkenhead remains a critical transport link and an enduring example of Mott MacDonald’s ability to push the boundaries of what is technically possible.
The UK’s National Highways is the first roads and highways owner-operator in the world to be accredited to PAS 2080, the newly updated international specification for managing infrastructure carbon.
Mott MacDonald in partnership with WSP, has been appointed to the Specialist Professional and Technical Services 3 (SPaTS3) Framework, commissioned by National Highways.
Mott MacDonald has been appointed to the Welsh Government’s new Electric Vehicle Charging Infrastructure (EVCI) four-year framework that will support its ambition to ensure all electric vehicle users can access charge points easily.
Mott MacDonald and key partner Fujitsu have delivered the tools for the Technology Operations Capability (T-TOC) project developing and implementing a suite of software tools that monitor and manage electronic assets across Highways England's network.
National Highways’ ambition to strengthen innovation capabilities and achieve long-term improvements has been underpinned by Mott MacDonald working to embed an innovation management strategy.
Mott MacDonald is working with Hampshire County Council to upgrade the existing M27 Junction 10 in Hampshire.
As part of our long-term framework partnership with National Highways, our specialists are coaching, challenging and supporting National Highways’ project management teams to create a culture of health, safety and wellbeing.
Our virtual library of standardised construction components has more than halved modelling and drawing time, delivering £3M in savings, while improving consistency and quality.
National Highways is committed to achieving net zero greenhouse gas emissions for its strategic road network in line with national and global agendas.
Our environmental mitigation plan helped the A3 Hindhead Tunnel win planning permission and get the backing of Natural England.
The single carriageway section of the A303 between Sparkford and Ilchester suffers from congestion and higher than average accident rates.
We were employed by Highways England to complete feasibility, preliminary and detailed design works for the M49 Avonmouth Junction scheme, to create a new grade-separated junction over the existing M49 to link to the new development area.
Sections of the 5.6km Bexhill-Hastings Link Road – called the Combe Valley Way – in East Sussex pass close to Combe Haven, a site of special scientific interest (SSSI), supporting semi-natural floodplain meadows, fen communities and ditches.