A newly updated specification, PAS 2080, has a crucial role to play in decarbonising the world’s buildings and infrastructure. Maria Manidaki explains how.
Specifications… pretty dull, right? Not this one. PAS 2080 empowers all organisations responsible for buildings and infrastructure to decarbonise them. PAS 2080 encompasses the whole lifecycle of assets, and every part of the value chain. It brings carbon into all aspects of decision making, from investment planning and the development of design options, through construction and asset management to end-of-life disposal.
PAS 2080 provides a common framework, approach, governance and language for carbon management, making it easier to set targets and incentives, and measure performance.
Creation of the specification was recommended in the UK government’s seminal Infrastructure Carbon Review, co-authored by Mott MacDonald and published in 2013. Mott MacDonald co-authored the first edition of PAS 2080, published by the British Standards Institution in 2016, and has co-authored the comprehensive update released in April 2023.
The update recognises the urgent need for action. In 2021 the UN Environment Programme’s ‘Infrastructure for climate action’ report found that the built environment is responsible for 79% of the world’s greenhouse gas emissions. Yet when the UK’s Green Construction Board reviewed the infrastructure industry’s progress on decarbonisation, also in 2021, it reported the pace was slow and achievements disappointing. PAS 2080 equips organisations throughout the built environment to accelerate and do better on decarbonisation.
PAS 2080 explains the necessity of climate resilience alongside decarbonisation: Measures designed, delivered and operated to provide protection against the physical impacts of climate change must be net zero carbon. Assets built as part of the transition to net zero must be resilient.
The update also warns that the world’s capacity for carbon storage is finite and potentially fragile – as increasingly common and destructive forest fires demonstrate. It urges organisations to seek a realistic balance between the carbon they produce and available carbon storage.
PAS 2080 draws attention to the co-benefits of carbon sequestration and biodiversity gain, whereby projects support a greater diversity and quantity of flora and fauna after completion than existed before. And it encourages the use of nature based solutions where possible, as low or zero carbon alternatives to conventional engineering.
PAS 2080 illustrates the benefits of early collaboration between project parties, and their roles and responsibilities throughout the project lifecycle. What is more it addresses decarbonisation challenges that lie beyond owners’ direct control requiring that users map out the ways in which assets are part of interconnected and interdependent networks and systems.
Collaboration between organisations and across systems will be required to address ‘hard to cut’ emissions and achieve reductions at the scale and pace required.
Behavioural change is a key focus. PAS 2080 sets out the requirement for leadership from asset owners and all other members of the value chain. Through strong and effective leadership, carbon reduction must be embedded in organisational policy and strategy, with clearly assigned roles and responsibilities for delivery. Leadership is also essential for aligning commercial goals with strategic decarbonisation goals.
The role of leadership extends to government, regulators and investors, all of which have important roles in ensuring decarbonisation is mainstreamed as a business risk and given due attention. PAS 2080 calls for coordination and collaboration vertically from top to bottom of the value chain, and horizontally within and between sectors.
Unless the organisations that own, plan, design, build, operate and care for buildings and infrastructure show leadership and drive the pace of decarbonisation themselves, the 2050 goals will be missed.Maria ManidakiTechnical principal: carbon net zero, water consultancy division
The UK government was a world leader in 2019 when it made a legally binding national commitment to achieve net zero by 2050. To date over 240 other countries and cities around the world have done the same thing.
But unless the organisations that own, plan, design, build, operate and care for buildings and infrastructure show leadership and drive the pace of decarbonisation themselves, the 2050 goals will be missed.
Ambition alone is not enough, as Copenhagen has recently discovered. In 2012 it announced plans to achieve net zero emissions but is likely to miss its 2025 target. Emissions targets must therefore be based on credible measures which are within the powers of those pledging them. PAS 2080 seeks to ensure that all stakeholders are coordinated in their approach so that all carbon reduction opportunities are discovered and aligned.
PAS 2080 is not a prescriptive check list of things to do. It recognises that there are very different conditions, challenges, opportunities and levels of maturity in decarbonisation for every organisation – and often within each organisation. Its detailed guidance provides the means for all to accelerate progress.
Maria is the technical principal for carbon net zero, water consultancy division
Delivering decarbonisation fairer and faster was the theme of Carbon Crunch 2025 in London this autumn. Keynote speaker Nigel Topping, the new chair of the Climate Change Committee, along with other speakers at the event explored why fairer matters and how going faster is critical to competitiveness.
In 2023, Mott MacDonald’s report Zero Emissions English Airports: Target Further Analysis, produced for the Department for Transport, explored the commercial feasibility of decarbonising airport operations across England.
How Port of Dover is leading the way on the drive to net zero was presented at Carbon Crunch 2025 in London and the session explored why decarbonisation strategies must be translated into tangible activities.
Mott MacDonald’s energy sector leader for Asia, Philip Napier-Moore, explores the opportunities and challenges shaping ASEAN’s clean energy transition – and what must happen next.
Google’s ambitious climate strategy is one that focuses not only on reducing its own environmental impact but also on enabling others to meet their sustainability goals. Speaking at Carbon Crunch 2025 in London, Google director of sustainability for Europe, Middle East and Africa Adam Elman outlined how the tech giant views its role as extending beyond its own decarbonisation.
Government has set out a Clean Power 2030 plan to decarbonise the electricity sector. But there is more to reaching this target in a fast and fair way than just finance, technology and infrastructure, according to speakers at Carbon Crunch 2025 in London.
Australia’s water infrastructure, much of it built in the 1960s and 70s, is at a critical juncture. Built for a different climate and demographic reality, many systems are now operating beyond their intended design life.
Mott MacDonald and WSP have been appointed by Great British Energy – Nuclear to provide environmental services and permitting support for the Wylfa SMR programme, advancing the UK’s shift to reliable low‑carbon energy.
TC Energy has successfully placed its Wisconsin Reliability Project into service, marking a major milestone in strengthening energy reliability across Wisconsin and northern Illinois.
The Bulan Solar PV and battery energy storage system (BESS) is a landmark cross-border renewable energy initiative, delivering clean electricity from Indonesia to Singapore. It’s set to become one of Southeast Asia’s most ambitious green energy ventures.
In a bold move to decarbonise its energy system, the Shire of Collie – long known as Western Australia’s “coal town” – is boosting its grid resilience and sparking regional growth with the Enpowered Collie solar and battery energy storage system (BESS).
The HyBont Green Hydrogen Project was one of the first onshore green hydrogen projects from the UK government’s Hydrogen Allocation Round One (HAR1) funding and is a potential model project for hydrogen production in the UK.