Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Natural flood management provides a wide range of benefits for society, from creating habitats and reducing soil loss to improving water quality and providing woodland and green spaces for wildlife and people.
Up to now, methods to assess the additional ecosystem services NFM delivers and integrate their value into decision-making processes for appraisal of flood risk measures have been lacking. The Eddleston Water project is addressing this issue. Funded largely by the Scottish government, with support from the EU’s Interreg initiative and the Scottish Environment Protection Agency among others, the project is led by Tweed Forum, the Rivers Trust for the Scottish Borders and north Northumberland. Tweed Forum appointed us to investigate how the multiple benefits from NFM can be effectively integrated into the process to assess and manage flood risk measures in Scotland.
The first step was to review existing environmental and social appraisal methodologies in the flood management sector to determine a single agreed approach for assessing additional ecosystem services. Information from the Ecosystems Knowledge Network Tool Assessor (ESKN) was supplemented by the expert knowledge of the project steering group and the results of a stakeholder engagement survey.
CIRIA B£ST – a benefits estimation tool to assess and monetise many of the financial, social and environmental benefits of blue-green infrastructure – was selected to help evaluate multiple benefits in flood risk management appraisals. We tested the tool on the Eddleston Water to evaluate its suitability, and our trial found that B£ST could reliably quantify all significant multiple benefits in the form of ecosystem services for the project.
When the methodology was applied to the Eddleston Water project, it was shown to provide ecosystem services benefits across amenity, biodiversity and ecology, carbon sequestration, education, flows in watercourse, water quality and pollution. Across a 100-year appraisal period, the value of the ecosystem services associated with the NFM measures already implemented at Eddleston Water – including the planting of 207ha of riparian woodland, re-meandering of 2.2km of river, planting almost 300,000 trees, removing of 2.9km of flood embankments and creating 28 ‘leaky ponds’ – were estimated at approximately £4.2M. A further £950,000 in flood damage was avoided. An additional hypothetical NFM business case building on the work of the Tweed Forum estimates the potential value from a higher density of NFM measures within the catchment would reach £17.7M overall and avoid flood damages of about £2.85M.
Including an assessment of the multiple value of NFM measures in flood risk management appraisal would enable decision-makers properly compare the costs and total benefits of all flood risk management measures – both grey and green. By prompting the use of CIRIA B£ST (or other methods) across flood risk management appraisals in Scotland, the consistency of appraisals should improve, ultimately increasing the value of flood risk management investments.
Rachel tells us all about her role at Mott MacDonald, her proudest professional moment and the importance of building a global support network.
Discover Sarah Perera’s journey as a principal civil engineer at Mott MacDonald, leading global water infrastructure projects and thriving in a collaborative, international environment.
As a senior associate mechanical engineer in our water utilities team, Owain Brown is dedicated to improving water quality.
Mott MacDonald has appointed four senior leaders into newly created technical delivery director roles. The new technical delivery director appointments will sharpen project governance, efficiency and programme outcomes for UK water clients.
Mott MacDonald celebrated moving into its new Manchester office in the heart of the city with the help of the Mayor of Greater Manchester, Andy Burnham.
Sun Yan Evans, Mott MacDonald flood risk and water quality technical director, has been elected as a Fellow of the Royal Academy of Engineering, the highest accolade in the profession.
Mott MacDonald has been selected by United Utilities to provide professional services including commercial assurance and audit, commercial and capital delivery resource, and estimating under its AMP8 frameworks procurement.
Mott MacDonald is proud to see the activation of London’s Tideway Tunnel, a generational infrastructure project that it has been heavily involved in from the start.
A groundbreaking major project featuring pioneering technology to protect Leeds and surrounding areas from the risk of extreme flooding is now complete following support from a joint venture partnership between Mott MacDonald and BAM Nuttall.
Wessex Water supplies water to over 2.9 million customers across south west England.
Mott MacDonald has been appointed to Northern Ireland Water’s new IF182 Professional Services Framework that will run for an initial four year term.
Thames Water, the UK’s largest water company has appointed a Jacobs Mott MacDonald joint venture to help deliver a brand-new drought resilience project.
Delivery of a 44,000m2 integrated constructed wetland to improve water quality in the River Dearne in Yorkshire, has benefitted from improvements in safety, cost and sustainability thanks to intelligent plant combined with AI.
After tidal flooding devastated Hull in 2013, the Environment Agency commissioned Mott MacDonald, in a joint venture with BAM Nuttall as BMMJV, to upgrade more than 7km of defences as part of the wider Humber Flood Risk Management Strategy.
Completion of the final phase of the Leeds Flood Alleviation Scheme (FAS) in autumn 2024 was not only a landmark moment for residents of the city, it was also the culmination of successful collaboration on the planning, design and delivery of the work too.
Tideway is spending more than £4bn to build a 25km tunnel that will divert flows away from the river and convey them to a treatment works.