The village of Llanfair Talhaiarn in Conwy, Wales has a history of flooding due to its location at the confluence of the Nant Barrog and River Elwy. In February 2020, Storm Ciara brought significant rainfall to the area and several properties in the village were flooded again.
Natural Resources Wales, the Welsh body for environmental regulation and advice, appointed us to complete a business justification case, and to design and deliver natural flood management (NFM) measures in the upper Nant Barrog catchment. This project is being part funded by the Welsh government’s innovative £2M NFM programme.
Following a site walkover, geomorphological assessment and geotechnical investigation, we identified leaky barriers and riparian planting as the best solution to complement a catchment-wide planting scheme being delivered by a local charity, Coed Cymru.
Twelve leaky barriers will be installed in the upper Nant Barrog. The locations have low-risk gradients (less than 4%) and channel widths (less than 3m) in line with leaky barrier best practice guidance. The locations of the barriers avoid access to a farm and an overhead high-voltage line. They also avoid a section of the watercourse that is currently experiencing high rates of erosion.
The barriers will consist of large, woody debris placed in the bottom half of the channel, with the top half formed of woven hazel and brash hurdles weaved between vertical hazel posts. Overall, the barriers will have a relatively informal arrangement, resulting in a natural aesthetic. There is a preference for barrier material to be sourced from the site, helping to minimise the carbon footprint of the scheme.
Riparian planting will cover an area of approximately 5000m2 in the upper reaches of the Nant Barrog, at locations close to the proposed leaky barriers. There are no leaky barriers planned for the lower and middle reaches of the Nant Barrog, so our solution avoids riparian planting in these areas as any small leaf litter material could block the trash screen in Llanfair Talhaiarn. The locations for the planting were also selected to avoid disturbance to the Coedydd Derw Elwy, a site of special scientific interest (SSSI) as well as a site of importance for nature conservation and an ancient woodland.
Once installed, the woody dams will attenuate the river flows and encourage water onto upstream floodplains, slowing the movement of water from the headwaters to the community in Llanfair Talhaiarn.
The measures selected will complement woodland and hedgerow cross-field planting being undertaken by Coed Cymru. We have worked closely with the charity’s project team to build relationships with landowners and farmers and generate support for NFM.
Our carbon assessment team estimate the scheme will have a carbon footprint of 20.75tCO2e, offset by the riparian planting benefits of 306tCO2e, delivering carbon sequestration of 221.1tCO2e. This wider benefit will contribute to Welsh government’s commitments under its 2021-25 Working together to reach net zero plan.
Rachel tells us all about her role at Mott MacDonald, her proudest professional moment and the importance of building a global support network.
Discover Sarah Perera’s journey as a principal civil engineer at Mott MacDonald, leading global water infrastructure projects and thriving in a collaborative, international environment.
As a senior associate mechanical engineer in our water utilities team, Owain Brown is dedicated to improving water quality.
Mott MacDonald has appointed four senior leaders into newly created technical delivery director roles. The new technical delivery director appointments will sharpen project governance, efficiency and programme outcomes for UK water clients.
Mott MacDonald celebrated moving into its new Manchester office in the heart of the city with the help of the Mayor of Greater Manchester, Andy Burnham.
Sun Yan Evans, Mott MacDonald flood risk and water quality technical director, has been elected as a Fellow of the Royal Academy of Engineering, the highest accolade in the profession.
Mott MacDonald has been selected by United Utilities to provide professional services including commercial assurance and audit, commercial and capital delivery resource, and estimating under its AMP8 frameworks procurement.
Mott MacDonald is proud to see the activation of London’s Tideway Tunnel, a generational infrastructure project that it has been heavily involved in from the start.
A groundbreaking major project featuring pioneering technology to protect Leeds and surrounding areas from the risk of extreme flooding is now complete following support from a joint venture partnership between Mott MacDonald and BAM Nuttall.
Wessex Water supplies water to over 2.9 million customers across south west England.
Mott MacDonald has been appointed to Northern Ireland Water’s new IF182 Professional Services Framework that will run for an initial four year term.
Thames Water, the UK’s largest water company has appointed a Jacobs Mott MacDonald joint venture to help deliver a brand-new drought resilience project.
Delivery of a 44,000m2 integrated constructed wetland to improve water quality in the River Dearne in Yorkshire, has benefitted from improvements in safety, cost and sustainability thanks to intelligent plant combined with AI.
After tidal flooding devastated Hull in 2013, the Environment Agency commissioned Mott MacDonald, in a joint venture with BAM Nuttall as BMMJV, to upgrade more than 7km of defences as part of the wider Humber Flood Risk Management Strategy.
Completion of the final phase of the Leeds Flood Alleviation Scheme (FAS) in autumn 2024 was not only a landmark moment for residents of the city, it was also the culmination of successful collaboration on the planning, design and delivery of the work too.
Tideway is spending more than £4bn to build a 25km tunnel that will divert flows away from the river and convey them to a treatment works.