Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
As a pivotal part of the corridor, T2T will deliver economic and social benefits by busting congestion for motorists and helping to keep Adelaide moving. Mott MacDonald provided design services for T2T, along with Aurecon and local firm Wallbridge Gilbert Aztec, working closely with the South Australian Department of Planning, Transport and Infrastructure (DPTI) and contractor CPB via the T2T Alliance. The project was funded by the state and national governments.
Once completed, the North-South Corridor will create a 78km link across Adelaide, from Gawler in the north to Old Noarlunga in the south. Projected vehicle numbers and freight traffic data showed this vital transport spine would not be able to deal with future growth. It has now been upgraded to provide a non-stop motorway along its full length. The 4km T2T section was a complex project with a high-risk profile. Major utility services were involved, included high-voltage cables and a substation. DPTI decided the project would be best delivered using the alliance delivery model, which inspired the project team to develop sustainable, game-changing technical solutions.
A 3km section of lowered, non-stop motorway forming the spine of T2T required 6km of retaining walls. The traditional solution would have been to build cantilevered contiguous piled walls using a significant amount of concrete. But by applying an unconventional unsaturated soil mechanics approach to Adelaide’s stiff clay soils, an optimised design was produced using 3m-7m-long steel nails drilled into the face of the excavated stiff clay walls and encased in grout, with a thin shotcrete surface layer providing stability. The design was tailored to suit ground conditions. Seven typical profiles were developed considering likely geological solutions and in-ground services layouts.
Observational construction methodology complemented these design profiles. The profiles removed design iteration and cut time requirements, and the lightweight, low-carbon soil-nail retaining wall solution provided huge financial savings, while also ensuring structural integrity of the wall and safety for motorists.
The innovative retaining wall design has been verified by the University of New South Wales. The T2T motorway opened in September 2018. More than 50,000 vehicles are using this section of the North-South Corridor daily, and it will be able to cater for anticipated growth of up to 115,000 vehicles per day. T2T achieved the DPTI’s project aspirations to create a non-stop motorway while maintaining the amenity of the local rail and road network.
An Australia-leading, and probably world-leading, example of innovative engineering design.Professor Adrian RussellUniversity of New South Wales
We spoke with Eimon about what her typical day looks like, how active listening empowers collaboration, and her advice to professionals looking to grow their careers.
Global practice lead for engineering services Ruth talks to us about working across time zones, embracing autonomy, and why engineering is a team sport.
Meet Pankaj Lalla, senior vice president based in Mumbai: driving private capital projects across India with bold leadership, global expertise, and a commitment to sustainable infrastructure.
Amy Child, our transport leader in South Australia, has a curious and flexible mindset. Her approach has helped her build strong connections across teams and contribute to projects spanning markets and locations.
Austin Transit Partnership, the local government corporation charged with implementing Austin’s first light rail system, has selected Austin Rail Constructors (ARC) as the construction contractor for Austin Light Rail, marking another major step toward beginning construction in 2027.
Wynton Habersham has joined Mott MacDonald as market leader for rail systems in the United States. In his role, he will lead the delivery of rail systems and train control professional services to clients in North America.
The Central Kowloon Bypass (Yau Ma Tei Section), a major new transport corridor in Hong Kong that strengthens Kowloon’s east–west connectivity and enhances overall network efficiency, opened on 21 December 2025.
The new Line 6 Finch West LRT significantly improves connectivity for residents and commuters, easing congestion on major routes and providing thousands of daily riders with safe, reliable, and environmentally sustainable transportation.
The opening celebration kicked off with speeches from community leaders and a ribbon cutting ceremony in Federal Way, Washington, followed by a day of planned special events to commemorate the achievement.
TC Energy has successfully placed its Wisconsin Reliability Project into service, marking a major milestone in strengthening energy reliability across Wisconsin and northern Illinois.
Our brilliant people proudly shape, design, engineer and deliver the outstanding transport projects that are moving people and places forward all over the world.
For decades, we have used digital innovation to deliver better outcomes for clients and communities. Now we are applying that same mindset to AI – grounded in robust data, strong governance and expert oversight. From EMMA, our agentic AI assistant, to advanced analytics and automation, we are turning AI’s potential into practical value on real projects.