Locale : Global (English)
X
Create document Page
added
Remove
page
Add
page
Review document
/
Page Added
Collected
Pages
Create
Release

29 August 2017

Sainshand wind farm achieves financial close, Mongolia

The 55MW Sainshand wind farm, located 7km west of Sainshand in Mongolia’s Gobi Desert, has successfully achieved financial close. Mott MacDonald was lenders’ technical, environmental and social advisor during the scheme’s financing stage and will now monitor construction and operations in an ongoing role.

Consisting of 25 2.2MW Vestas wind turbine generators, the renewable energy generated by the Sainshand wind farm will be transmitted to an on-site substation. There, the voltage will be increased from 35kV to 110kV by a transformer before being transported to the grid connection point via a 4km transmission line. Once operational, the wind farm is expected to generate approximately 190,000MWh of electricity per year, enough to power 130,000 homes.

Mott MacDonald’s due diligence pre-financial close included reviewing early stage designs, the track-record of each project participant, the project schedule and contractual arrangements, construction and operational plans, grid impact study and energy yield assessment. The consultancy also undertook environmental and social impact assessments and analysed how the corresponding plans would feed into the financial model.

Matthias Vinard, Mott MacDonald’s project director, said: “Under its national power policy, Mongolia is aiming for a 20% renewable share of the energy mix by 2020 and 30% by 2030. Sainshand will help to diversify the country’s energy sources, reducing dependence on coal and decreasing CO2 emissions by up to five million tons over its lifetime.”

“Sainshand will be the country’s third commercial-scale wind farm and our experience on the first two has been significantly useful in understanding the country-specific challenges being faced, such as grid integration,” Matthias added.

The Sainshand wind farm is expected to become operational in the first half of 2019.

expand-image mail-envelope icon-icon-linkedin-mmdv-green icon-close arrow-left icon-section icon-section-white arrow-down icon-arrow-down-sml icon-arrow-left-lrg icon-arrow-left-sml icon-arrow-right-lrg icon-arrow-right-sml icon-arrow-up-sml icon-champions icon-section icon-section-white icon-download icon-education icon-email icon-grid-view icon-language icon-link-to icon-list-view icon-location icon-login-register ec-icon-login-register icon-ec-apply-arrow icon-ar-apply-arrow icon-mm-icon-search-ec icon-minus icon-more icon-phone icon-plus icon-recently-viewed icon-search icon hash key-facts-corner-sash quote-underline social-icon-facebook social-icon-googleplus social-icon-linkedin social-icon-twitter social-share-icon-facebook social-share-icon-facebook social-share-icon-googleplus social-share-icon-googleplus social-share-icon-instagram social-share-icon-instagram social-share-icon-linkedin social-share-icon-linkedin social-share-icon-twitter social-share-icon-twitter social-share-icon-youtube social-share-icon-youtube sina-weibo MM-Shape01-Quote-Views MM-Shape03-Quote-Locations MM-Shape05-Quote-Projects MM-Shape12-Quote-Sectors MM-Shape13-Quote-Expertise MM-Shape14-Quote-About-Us MM-Shape14-Quote-Careers checkmark icon-expand-view icon-apply-now menu linkedin-mmdv-green icon-ad-close mail-mmdv-green icon-ad-menu menu-close ec-menu-close sphere icon-cookies icon-legal icon-registered-companies target rotate-screen video-replay-flat video-replay audio-mute audio-play
×
Mott MacDonald main logo

Would you like to hear more from us?

Sign up to receive notifications