AI data centre growth is creating unprecedented electricity demand, making access to reliable power a defining factor for new facilities

Grid constraints and dynamic AI loads are driving integrated approaches

Developers, utilities and infrastructure partners must plan for power from day one to reduce connection risks and improve resilience

Article

How data centre demand to meet growing AI use is reshaping the energy landscape

As AI drives demand for data centre capacity, reliable power is becoming one of the defining constraints to developing new facilities. Mott MacDonald energy networks technical delivery manager Andrew Coffey and business development manager Colm Hegarty set out what this means for the future of energy infrastructure and for the organisations planning, funding and delivering it.

Data centre growth to meeting increasing AI demand is creating a clear opportunity in the energy market: the chance to plan, fund and deliver both the data centre infrastructure and power systems needed for the next phase of digital growth.

The challenge is that data centre power demand is growing at a scale that many European power systems were not designed to accommodate. With AI-driven facilities increasingly requiring hundreds of megawatts per site and Europe's largest markets continuing to expand despite severe power constraints, energy infrastructure has become the primary determinant of project viability.

Electricity transmission pylons and overhead power lines silhouetted against a sunset sky.

Cities like London and Frankfurt alone are expected to exceed 2.5GW operational capacity in 2026 while demand across Europe continues to outpace new supply despite annual data centre capacity growth of nearly 20%. As a result, decisions on location, grid connections, generation, storage, funding and delivery must be integrated from the outset with developers increasingly adopting whole-system energy solutions to secure capacity and reduce deployment risk. For utilities, network operators, asset owners, contractors and developers, data centres are no longer simply another customer load; they are shaping investment decisions, grid planning and new energy infrastructure models.

When demand grows faster than the grid

Across many markets, AI data centre growth is moving faster than energy infrastructure can respond. Hyperscale data centre operators such as Microsoft, Google, AWS and Meta are bringing forward increasingly ambitious projects. These hyperscale campuses, which typically comprise multiple data centre buildings on a single site, can require substantial power capacity and are often delivered within compressed development programmes. Constrained networks, long connection queues, ageing transmission assets, equipment lead times and permitting requirements can quickly become barriers to delivery, while public objection and consenting challenges are increasingly adding to programme risk.

AI workloads add further complexity. They create concentrated and dynamic demand profiles that can affect system stability, resilience and network modelling. Transmission and distribution operators must respond while integrating more renewable generation and maintaining service reliability for existing customers.

Governments, regulators and system operators are already looking at strategic siting policies, smarter connection agreements and “use it or lose it” provisions to allocate capacity more effectively. For example, Ireland's Commission for Regulation of Utilities now assesses data centre connections based on network constraints and location-specific criteria; while the Netherlands has restricted new hyperscale data centre development to designated regions through national planning policy to better manage grid and land availability.

In parallel, utilities are introducing additional requirements to ensure that data centre developers design internal power systems in line with grid connection agreements. These include more demanding performance criteria governing how a facility’s network responds following instability on the utility grid.

Bundles of data cables arranged in cable trays inside a data centre.

New models for securing power

Traditional grid-led approaches remain dominant, but they are no longer the only route to delivery. Developers are considering a wider mix of technical and commercial options, including co-location with generation, energy parks, private wire arrangements, power purchase agreements (PPAs), battery energy storage systems (BESS) and hybrid systems. Together, these approaches point towards a broader energy ecosystem model, where generation, storage, demand, network access and commercial agreements are planned as one connected system rather than as separate project components.

For energy companies and infrastructure owners, the shift creates new business models and new investment opportunities. Energy parks that combine generation, storage and demand can unlock capacity and improve system flexibility. Some existing assets are also being reassessed for development potential, including sites where legacy infrastructure could support future data centre power needs. Well-planned data centre demand could also help fund the grid upgrades needed to support wider economic growth and greater use of domestic renewables, including in community energy schemes.

These solutions still need careful system integration. Dynamic AI loads can change quickly, so power systems need to remain stable during network disturbances, respond rapidly when frequency shifts and meet the technical rules required to operate safely on the grid. Behind-the-meter generation and storage – where power is produced or stored on site rather than supplied entirely through the public network – must also work with the wider system. No single technology will solve the combined capacity, resilience and delivery challenges created by AI data centre growth. Small modular reactors continue to interest hyperscale technology companies, but commercial deployment remains some years away. In the short term, growth is more likely to depend on a combination of renewables, BESS, gas generation, PPAs and emerging lower-carbon fuel alternatives.

Many hyperscale operators are also moving beyond project-by-project solutions and planning energy across global portfolios. They are looking for repeatable approaches to generation, storage, grid access and infrastructure delivery that can work across multiple markets while responding to local constraints.

That creates both a challenge and an opportunity. Supporting hyperscale data centres now requires power, environmental planning, water, infrastructure and system integration expertise to come together within a delivery model that can be applied consistently at scale.

Planning for power from day one

Future growth will depend on making earlier energy decisions. That starts with understanding where demand should be located and how generation and storage can work together. It also means choosing commercial structures that make delivery investable, while considering grid connections, resilience, planning and environmental constraints as one system. The organisations that gain an advantage will treat power as the starting point for data centre development, not as a constraint to manage once a preferred site has been selected.

That creates a different test for developers, utilities, network operators and asset owners. The opportunity is no longer just to secure enough electricity for individual sites, it is to shape energy ecosystems that support digital growth, protect network stability and unlock new routes to value.

Over the next five years, data centre clients could play a significant role in delivering the next generation of power networks, adding generation and grid capacity and resilience that benefit local communities and grids as well as their own sites, including through community renewables and local grid contributions. By bringing power strategy, grid integration, generation, storage, infrastructure delivery and environmental planning together from day one, organisations can move faster, reduce connection risk and create more resilient models for long-term investment.