The Coastal Rail Emergency Project – Area 3 at Mariposa Point in San Clemente, California, has reached completion. The Orange County Transportation Authority (OCTA) marked the occasion with a ribbon-cutting ceremony and reopening of a section of the San Clemente Beach Trail, restoring coastal access and strengthening protection for a critical rail corridor.
Delivered in response to ongoing bluff movement, beach loss, erosion, and deteriorating railroad shoreline protection, the project addresses major concerns at the point where the coastal bluff, railroad, pedestrian trail, and ocean converge. Area 3 included construction of a nearly 1,400-foot catchment wall designed to protect the tracks from falling rocks, soil and debris; a new pedestrian bridge over the Mariposa Channel; reconstruction of the beach trail; and other site improvements.
Image credit: OCTA
Image credit: OCTA
Image credit: OCTA
As program manager and construction manager, Mott MacDonald supported OCTA in coordinating and delivering the emergency works in a constrained and technically complex coastal environment. We also partnered with HDR to develop the conceptual design for the pedestrian bridge and trail, helping integrate community access and safety with the infrastructure needed to protect ongoing rail operations.
“At Mariposa Point, protecting the railway and restoring access to the coast had to go hand in hand. Working closely with OCTA, HDR, and our construction partners, we helped bring those priorities together in a challenging coastal setting,” said Raj Murthy, program director at Mott MacDonald. “This milestone is an important step toward a more resilient rail corridor, while giving residents and visitors back a valued connection to the coast.”
The rail line through San Clemente forms part of the Los Angeles–San Diego–San Luis Obispo (LOSSAN) Rail Corridor and carries Metrolink and Amtrak Pacific Surfliner passenger services, as well as freight and military transportation. Since 2021, coastal bluff failures and erosion have caused repeated service interruptions. Area 3 provides substantially greater protection at Mariposa Point, helping maintain rail service across Southern California and supporting the movement of people and goods along the wider California corridor.
Completion of the project improves safety for rail passengers, crews, trail users, and the surrounding community while responding to the growing effects of climate change on vulnerable coastal infrastructure. The rebuilt trail and new pedestrian bridge restore a popular recreational connection for residents and visitors. Together, the improvements help preserve public access, protect a nationally significant transportation route, and strengthen the corridor’s resilience as OCTA continues to advance near- and long-term solutions for California’s coastline.