The Elizabeth line opened on 24 May 2022, with trains travelling through new tunnels under central London. Ensuring the safe operation of the line was years in the making. Our human-centred design (HCD) team were there from the start.
The RCC combines signalling and power control with train service delivery teams, operating an end-to-end service from one control room.
Rail for London Infrastructure (RfLI) is responsible for Elizabeth line infrastructure management in the Central Operating Section (COS) between Westbourne Park Junction in the west and Abbey Wood in the south-east and Pudding Mill Lane Junction in the east. Mass Transit Railway – Elizabeth line (MTREL) operates the fleet of trains across the entire line.
Both companies’ Elizabeth line control functions are based at the RCC, and they work together on managing the trains.
The dedicated control suite at Romford includes operational control, incident and training simulator facilities, and brings together people, operations, management, control systems and physical equipment in one place. By recognising the interaction between these elements, our HCD team developed a space designed to support operator performance and minimise human error.
Our team apply science-based principles, underpinned by psychology, physiology and anthropometrics, to any context where people interact with objects, places or other people. They brought this knowledge of how people think and what people do to design a user-centred solution for the RCC. In addition to ensuring a human-centred design based on control room function requirements, the team were also responsible for undertaking validation exercises during trial running of both trains and operations.
ISO 110640, the international standard on ergonomics design of control centres, governed the development of the RCC. The standard takes a socio-technical approach, meaning designs must take account of the organisation’s various interacting social and technical subsystems – the people, infrastructure, technology, culture, processes and goals. It informed the layouts of the control room, suite and workstations, as well as the designs for the displays and controls, environment (lighting, temperature and noise), and organisational and management systems, including roles, responsibilities and procedures.
Collaboration between our HCD team, Crossrail, RfLI and other stakeholders, including Network Rail and contractors, was strong from the start. A total of 869 human factor design requirements were developed and agreed with Crossrail, RfLI and representatives of the train operating company. We adopted an iterative design approach, with engagement with stakeholders and contractors to validate the designs at each key phase. Conceptual layout options based on existing control rooms and new, innovative designs were developed, and 2D CAD models were drawn to provide a visual demonstration of each option. The layout options were assessed in a design development workshop with Crossrail and RfLI to select the one that best met the requirements.
This process enhanced and refined aspects of the operational layout, mapping the key communication relationships between operators by discussing different operational scenarios with end-user representatives. A full-scale mock-up of the proposed control room involving end-users was then built to further refine and validate the final design. The detailed design phase also involved testing the operability and useability of systems, with operability assessments with end-users across a range of scenarios to validate the design of each system.
The final phase of the design was undertaken during the trial running and test operations between April 2021 and March 2022. Our HCD team observed the operators as they were engaged in more than 40 operational scenarios, under a range of normal running, degraded and emergency conditions. The team assessed and validated the integrated operability of systems and equipment, ensuring that the control suite sufficiently supported operators in their roles and tasks. This design stage provided assurance evidence to support the opening of the Elizabeth line.
Realising Australia's high-speed rail ambitions will require the certainty to move from business case to operation with clarity and confidence.
Simon MacMull and Jon Lancaster set out five principles for successful CBTC projects that manage technical improvements alongside organisational change.
Over the past two decades, cities have embraced new solutions in surface flood management that deliver environmental and social value alongside flood mitigation.
Even where intentions are aligned, PFI handback can stall when contractual requirements lack clarity and assessments lack consistency.
Data gaps are one of the most significant, and underestimated, risks in PFI handback. Mott MacDonald commercial director Katherine Jackson explains in this third part of her blogs on PFI handback challenges.
Late mobilisation remains one of the most consistent drivers of cost, risk and tension in PFI handback, explains Mott MacDonald commercial director Katherine Jackson.
As the first wave of UK PFI contracts approaches expiry, handback is proving to be far more than a contractual milestone. It is where years of decisions, assumptions and asset performance are tested - often all at once.
Senior project engineer Amanda Wachenfeld discusses her approach to improving processes that allow for increased efficiency across her teams and projects.
Paul's career spans more than four decades and multiple continents, with hands‑on experience across roads, rail, aviation and major infrastructure delivery, shaped by some of the world’s most demanding projects.
As part of an integrated team alongside Stantec and Westmar Advisors, we will help to modernize a vital link between British Columbia’s Lower Mainland, Sunshine Coast, and Vancouver Island.
Mott MacDonald and One Million Mentors are expanding their partnership in 2026, bringing mentoring opportunities to young people in London and the West Midlands.
The CPS2 framework will be used by central government departments, arm’s length bodies and the wider public sector to procure professional services across infrastructure, the built environment and defence.
Over the past decade Mott MacDonald has revolutionised the approach to stakeholder consultation through the creation of an engagement tool hosted on its Consents Management platform.
The Ohio River Tunnel is the first of three combined sewer overflow (CSO) tunnels at the core of ALCOSAN’s Clean Water Plan.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.