The north and south reaches of the Perris Valley Pipeline were constructed more than a decade ago to expand water delivery to the Eastern and Western Municipal Water Districts of Riverside County in California.
However, the segment crossing under Interstate 215 (I-215) could not be constructed at the time because of complex ground conditions and higher-than-anticipated groundwater inflows. Completing this final connection was essential to improving regional water delivery capacity and supporting a more reliable supply for growing communities east of Los Angeles.
The I-215 crossing involved construction of approximately 3,000 linear feet of 97-inch (2.46m) diameter steel water transmission pipeline. Most of the work was delivered through three microtunnel drives and four tunnel access shafts, with the final drive passing beneath I-215 and railway corridors.
The project’s location created several technical and logistical challenges, including maintaining traffic along Van Buren Boulevard; coordinating with adjacent property owners, Caltrans, rail stakeholders, and permitting agencies; protecting active transportation infrastructure; and managing groundwater and potential contaminants. To reduce disruption at the surface and safely complete the crossing, the project team used a 123-inch (3.12m) microtunnel boring machine to install large-diameter casing below ground.
Mott MacDonald joined the project team in 2023 to provide specialized tunnel and shaft expertise in support of MWD’s Construction Management Unit. As a prime construction management partner, we provided technical support to help MWD and contractor J.W. Fowler progress the final segment connecting the north and south reaches of the Perris Valley Pipeline.
We helped the team navigate the complexities of large diameter microtunneling, shaft construction, and groundwater treatment, drawing on our expertise across tunneling, geotechnical engineering, permitting, and stormwater management. We provided construction inspection, tunnel engineering support, technical review, and risk management services for the project.
To support safe and efficient delivery, we established observation protocols, analyzed instrumentation and microtunnel boring machine data, and provided recommendations to address emerging field conditions. We also introduced additional ground movement monitoring and enhanced stakeholder coordination measures, helping strengthen collaboration and manage risks throughout this complex underground crossing.
The completed Perris Valley Pipeline I-215 Crossing connects the final segment of a major water delivery pipeline, improving regional water delivery capacity, strengthening system reliability, and supporting the long-term needs of growing communities in Southern California. The project also demonstrates how trenchless construction can help deliver essential infrastructure while minimizing surface disruption in busy transportation corridors.
Over the past two decades, cities have embraced new solutions in surface flood management that deliver environmental and social value alongside flood mitigation.
With ever-changing and increasingly complex contractual model interfaces, proper understanding and allocation of the responsibility for construction impact assessments, risks, and instrumentation and monitoring is essential.
Utility companies and private organizations in the United States operating municipal wastewater treatment plants are facing major challenges pertaining to their residual solids.
Nan explains how working across disciplines, sharing knowledge, and embracing diverse perspectives helps deliver positive outcomes and creates opportunities for growth.
Senior project engineer Amanda Wachenfeld discusses her approach to improving processes that allow for increased efficiency across her teams and projects.
To honor the three-year anniversary of its full service to Grand Central Station, we caught up with four of our tunnelling experts in New York as they reflect on their years of work on East Side Access.
We caught up with water engineering designer Samantha Alix to talk about her role within our business and the importance of client relationships, communication, and seeking opportunity early in your career.
Pre-construction activities have started on the Ohio River Tunnel (ORT) project in Allegheny County, Pennsylvania, following the award of the over $1 billion construction contract to Brayman-Lane JV.
Our role focuses on the major design-build package covering excavation, tunneling, and structural shells for the future 106th Street Station and its connecting tunnels.
Over the past decade Mott MacDonald has revolutionised the approach to stakeholder consultation through the creation of an engagement tool hosted on its Consents Management platform.
The Ohio River Tunnel is the first of three combined sewer overflow (CSO) tunnels at the core of ALCOSAN’s Clean Water Plan.
Safeguarding canal communities from sewage overflows and enhancing public waterfront spaces in Brooklyn, New York.
We helped protect the health of Middlesex County residents and the integrity of the local environment by designing a pump station to support a more robust and resilient wastewater transmission system.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.