We support a growing portfolio of enterprise-ready digital solutions that are secure, easy to integrate, and scalable to meet the needs of projects of any size.
Expert insights on issues that transform business, increase sustainability and improve lives
Here’s a snapshot of what we’re thinking about. Explore these highlights or view the full library to dive deeper into the ideas shaping our work.
Meet some of our passionate problem-solvers, constructive creatives and inspiring innovators
Near-surface underground structures can be difficult to assess reliably using published simplified methods for seismic design.
Detailed seismic soil-structure interaction (SSI) analysis driven by collaborative thinking presents an opportunity to reduce uncertainty of structural behavior.
This results in clearer design decisions, reduced unnecessary analysis, and greater confidence in the resilience of critical underground transit assets.
Structural design of underground transit infrastructure is challenging by nature. Near-surface structures, such as stations, ticket halls, egress structures, and connecting assets all respond differently to ground movement, especially in areas where seismic risk is present but not extreme.
For owners and design teams, the question is often simple: how much analysis is enough? Detailed modeling can provide valuable insights, but it is not always needed for every structure. The challenge is knowing when a simplified method is appropriate and when it needs to be verified against the specific project context.
Many cities are investing in transit upgrades while facing tighter programs and greater cost scrutiny. At the same time, owners need confidence that underground structures will perform as expected during an earthquake.
Simplified seismic methods can help, but only when their assumptions fit the structure. Some methods work well for deep, flexible station boxes. Others are suited for more rigid behavior such as station headwalls. Near-surface structures can be harder to categorize because their depth, stiffness, openings, and construction sequence can vary significantly.
In this type of situation, a calibrated approach can help teams move beyond a single design method and choose the level of analysis that fits each structure. For a connected station environment, that might mean treating deep platform boxes, near-surface structures, headwalls, and supporting excavation elements differently, based on how each is expected to respond during ground movement.
Rather than applying detailed modeling across the full scope, targeted analysis can be used to confirm where established simplified methods are sufficient and where state-of-the-art modeling is essential to make the approach feasible.
The benefit is a clearer route from complex ground behavior to practical design inputs. Teams can focus on detailed analysis where it adds value, then use the findings to apply simplified methods with greater confidence across similar assets.
This starts by using detailed analysis selectively. Instead of applying it everywhere, teams can use it to understand how the ground and structures are likely to interact during seismic loading, and where simplified methods may need adjustment.
Those findings can then be translated into a practical design workflow. The goal is not to recreate every detail of an advanced model, but to develop a simplified approach that reflects the representative trends and provides a sound basis for structural design.
The outcome is a more flexible and proportionate way to support seismic design. Established simplified methods can continue to be used where they fit, while the response of more complex near-surface structural elements can be tested and calibrated where needed.
This helps avoid unnecessary detail where it is not needed and reduces uncertainty where standard assumptions are less reliable. It also provides focused analysis and practical design inputs that can be applied consistently across multiple assets.
For owners and delivery teams, the lesson is to start with the design question rather than the analysis tool. If the assumptions behind a simplified method match the structure, it may provide the right level of evidence. If they do not, targeted calibration using detailed modeling can help close the gap.
Used in this way, detailed analysis becomes more than a technical exercise. It helps teams make better decisions about risk, effort, and design confidence.
Risk management is critical to the success of complex underground infrastructure projects. Learn how construction impact assessments, risk allocation, instrumentation and monitoring help manage uncertainty and protect project outcomes.
Women’s travel patterns have historically differed from men’s in distinct ways. These patterns continue to evolve and remain important considerations for transportation planning across North America.
Canadian transportation agencies are increasingly exploring AI-driven solutions that support real-time monitoring, predictive maintenance, and adaptive traffic control systems.
To honor the three-year anniversary of its full service to Grand Central Station, we caught up with four of our tunnelling experts in New York as they reflect on their years of work on East Side Access.
We spoke with Eimon about what her typical day looks like, how active listening empowers collaboration, and her advice to professionals looking to grow their careers.
We caught up with Sander to explore his career journey, the role of trust in leadership, and how curiosity shapes his approach to urban mobility.
As part of an integrated team alongside Stantec and Westmar Advisors, we will help to modernize a vital link between British Columbia’s Lower Mainland, Sunshine Coast, and Vancouver Island.
The Highway 1 Colquitz River Bridges project has reached completion, marking a major milestone for transit users and communities in Greater Victoria, British Columbia.
Successful completion of urgent repair work to a key historic wooden road bridge in Delta, British Columbia has restored a vital connection to the Westham Island farming and residential community.
The East Link Extension is part of Sound Transit’s regional system expansion program, crossing Lake Washington and linking Redmond, Bellevue, Mercer Island, and Seattle via the I-90 floating bridge.
Austin Transit Partnership, the local government corporation charged with implementing Austin’s first light rail system, has selected Austin Rail Constructors (ARC) as the construction contractor for Austin Light Rail, marking another major step toward beginning construction in 2027.
Wynton Habersham has joined Mott MacDonald as market leader for rail systems in the United States. In his role, he will lead the delivery of rail systems and train control professional services to clients in North America.
The new Line 6 Finch West LRT significantly improves connectivity for residents and commuters, easing congestion on major routes and providing thousands of daily riders with safe, reliable, and environmentally sustainable transportation.
The opening celebration kicked off with speeches from community leaders and a ribbon cutting ceremony in Federal Way, Washington, followed by a day of planned special events to commemorate the achievement.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.