Leeds is in a catchment where river levels can rise rapidly in response to rainfall and there is rising risk of fluvial flooding. To protect the city and its almost 800,000 residents, the council and Environment Agency are combining traditional engineering methods and natural flood management (NFM) to improve defences and build resilience. The project will introduce NFM across the 700km2 of the River Aire catchment, from Armley, west of the city centre, to Malham in the Yorkshire Dales. It is the largest NFM project in the UK.
As part of our work to identify and deliver the most appropriate and effective NFM schemes across the catchment, we’ve developed a suite of innovative geographic information system (GIS) tools to provide a consistent approach. We also created a risk-based leaky barrier tool to help pinpoint the best locations for installation as well as a Woodland Carbon Code tool to estimate carbon sequestration from the creation of woodland.
Our nature-based interventions have been tested at several pilot sites. These include:
Our systematic, repeatable and auditable process for managing the development and delivery of NFM solutions will be used at hundreds of sites across the catchment. Key to its success is our GIS platform, which will facilitate the advance of a pipeline of sites and lead users through from feasibility to concept design, and then delivery and ongoing management of the assets.
Millions of new trees and other vegetation will be planted to capture and store carbon, promote biodiversity and create new habitat as well as intercept and slow the flow of rainwater into the River Aire. Runoff pathway management, and river and floodplain management interventions, such as leaky barriers, will also be implemented to store and slow the flow of water in the uplands.
Overall, NFM will improve the climate resilience of the city of Leeds and other communities throughout the catchment as well as deliver a range of wider benefits for people and nature.
Civil engineer Sally Russell combines her industry expertise and people leadership capabilities as she takes on the role of leading Mott MacDonald’s water and environment business.
First phase of a collaborative Mainstreaming Nature-based Solutions programme, supported by Ofwat’s Innovation Fund, has concluded. Mott MacDonald technical director for nature-based solutions Marieke Nieuwaal shares the achievements to date, lessons learned and the next phase of work for this project.
Data gaps are one of the most significant, and underestimated, risks in PFI handback. Mott MacDonald commercial director Katherine Jackson explains in this third part of her blogs on PFI handback challenges.
Late mobilisation remains one of the most consistent drivers of cost, risk and tension in PFI handback, explains Mott MacDonald commercial director Katherine Jackson.
As the first wave of UK PFI contracts approaches expiry, handback is proving to be far more than a contractual milestone. It is where years of decisions, assumptions and asset performance are tested - often all at once.
Rachel tells us all about her role at Mott MacDonald, her proudest professional moment and the importance of building a global support network.
Discover Sarah Perera’s journey as a principal civil engineer at Mott MacDonald, leading global water infrastructure projects and thriving in a collaborative, international environment.
As a senior associate mechanical engineer in our water utilities team, Owain Brown is dedicated to improving water quality.
Mott MacDonald has secured a leading role on Scotland Excel’s £160M national framework, supporting local authorities across Scotland with sustainable infrastructure and engineering services.
National Highways Environment Sustainability Strategy & Standards Group has awarded the Road Period 3 (RP3) Water Quality Plan Technical Partner Support phases to Mott MacDonald, WSP, Ramboll, Arup and AECOM.
Mott MacDonald has appointed four senior leaders into newly created technical delivery director roles. The new technical delivery director appointments will sharpen project governance, efficiency and programme outcomes for UK water clients.
Mott MacDonald celebrated moving into its new Manchester office in the heart of the city with the help of the Mayor of Greater Manchester, Andy Burnham.
Sun Yan Evans, Mott MacDonald flood risk and water quality technical director, has been elected as a Fellow of the Royal Academy of Engineering, the highest accolade in the profession.
Over the past decade Mott MacDonald has revolutionised the approach to stakeholder consultation through the creation of an engagement tool hosted on its Consents Management platform.
Delivery of a 44,000m2 integrated constructed wetland to improve water quality in the River Dearne in Yorkshire, has benefitted from improvements in safety, cost and sustainability thanks to intelligent plant combined with AI.
After tidal flooding devastated Hull in 2013, the Environment Agency commissioned Mott MacDonald, in a joint venture with BAM Nuttall as BMMJV, to upgrade more than 7km of defences as part of the wider Humber Flood Risk Management Strategy.
As a leading and trusted supplier on the Environment Agency’s Client Support Framework, we play a pivotal role in mitigating flood and coastal erosion risks while advancing the Environment Agency's net-zero aspirations.