Our engineers have successfully pioneered the observational method on some of the world’s most complex projects
It has been the only option to rescue projects in difficulty
Innovation in digital technology is making it faster to employ
The observational method has been used to deliver some of the world’s most challenging projects safely and cost effectively. And yet, very few people know about it. Our engineers are working to change that.
From the Channel Tunnel in the 1980s to Boston’s ‘Big Dig’ highway programme in the 90s, raising Wembley’s iconic arch in 2004, excavation of deep shafts on the Elizabeth Line and current earthworks on HS2, this powerful methodology has been used to minimise risk and maximise efficiency in underground construction. In some cases it has been the only way to safely deliver complex underground works or rescue projects from difficulty.
Used in raising Wembley’s iconic arch in 2004, the observational method has been used to minimise risk and maximise efficiency in underground construction.
In our latest heritage podcast with Engineering Matters, our award-winning geotechnical engineers describe how they pioneered the method on some of the world’s biggest projects.
“Its outstanding success in the 1980s, when applied to the Channel Tunnel, paved the way for a whole series of very successful applications on major infrastructure projects over subsequent decades,” recalled Alan Powderham, former Mott MacDonald director of transportation, when interviewed for the podcast.
Later applications included the raising of Wembley Stadium’s iconic arch. Twenty years on from that spectacular achievement, geotechnics practice lead Tony O’Brien explains why the observational method was key to managing the massive and complex loadings on foundations for the arch itself and the multiple jacks and turning struts used to raise it into position.
Its outstanding success in the 1980s, when applied to the Channel Tunnel, paved the way for a whole series of very successful applications on major infrastructure projects over subsequent decades.
Listen now to find out more and hear from more of our experts including geotechnical director Rob Talby, technical principal Hock Liong Liew, and graduate civil engineer Sophie Smith. We also talk to HS2 Phase 2 engineering director and former Mott MacDonald engineer Alistair Hitchcock.
Lola's fascination with what lies beneath the ground started in childhood and has led to an engaging career that has spanned 20 years and multiple high profile projects.
We caught up with senior process safety engineer Steven Melens to talk about his role in the nuclear civil and defence team within our UK and Europe energy business.
Mott MacDonald has signed the advance market commitment (AMC) for next generation low carbon concrete, joining a coalition led by Innovate UK to accelerate the UK’s transition to net zero in construction and infrastructure.
Mott MacDonald has appointed Andy Clarke as development manager, UK and Europe for its Heavy Civil Infrastructure (HCI) division.
Sydney Fish Market is one of Australia's most visited destinations and the centrepiece of a local urban renewal project. At the heart of the new building is a spectacular and technically innovative timber roof.
Queen Mary Hospital is one of Hong Kong’s five major trauma centres and is currently undergoing a transformation into a state-of-the-art health sciences centre. A new 34-storey tower has been substantially completed, making it the tallest hospital in Asia.
Lessons learned from renewal of the runway at RAF Lossiemouth in Scotland in 2021 have benefitted the recently completed runway refurbishment works at RAF Leeming.
This special report tells the full story of our involvement, from start to present: from the 1980s studies that outlined options for relocating the airport, to the opening of the airport’s third runway in November 2024.
A new water line will serve the citizens of Vancouver with years of drinking water.
Receive our expert insights on issues that transform business, increase sustainability and improve lives.